What the supplier evidence checklist measures
Bars depict evidence completeness targets for a buyer review: model geometry, material traceability and installation sequence. They are not measured factory performance, a market survey or a promise for an unreviewed supplier.
Design basis attached before nestingCheck: site inputs named
Secondary steel piece-marked to the modelCheck: piece marks match
Lift points shown on the erection sheetCheck: lift plan attached
Coat reading filed with the piece markCheck: coat records linked
Cladding and frame choices, side by side
Buyers ask which core to put in a cold storage steel structure warehouse and whether to galvanize or paint the frame. Both questions have two defensible answers. The wrong move is to hide the condition that makes one answer fail.
EPS or PIR core versus rock wool
Foam cores are lighter and can post a lower U-value at the same thickness. For a quotation comparison, ask each supplier to state the core type and density, panel thickness in mm and declared U-value in W/(m²·K). Ask for the assembled wall calculation separately, with the panel joints and fixing details identified. Foam needs a fire strategy that looks at the tested assembly, the joints and the openings. Rock wool panels generally weigh more than comparable foam-core panels. Check the supplier’s panel mass, lifting plan and joint details for either core. Rock wool does not make the door or the column fire rated. The supplier comparison records the core, the density if supplied, and the test the buyer is actually citing.
Galvanized secondary steel versus painted frames
Z275 on purlins and girts suits many inland and mild industrial roofs because the coating is already on the coil. Welds and saw cuts still need repair, or the coating story is incomplete. Painted carbon steel on primary frames allows a specified color and a blast-plus-film system, and it needs a maintenance cycle the owner accepts. A coastal hangar may justify a heavier coat or a duplex system. Copying an inland paint note onto that site is how early rust shows up at the door jamb. Neither option is a permanent corrosion waiver.
A third split is volumetric modular construction against a panelized or stick portal frame. A relocatable building near container size can leave the factory with more of the envelope closed. Transport width, lifting weight and the foundation interface then dominate. A permanent modular construction hall that is really a portal frame on a slab should be permitted as a building, not described as temporary to avoid the energy or accessibility chapter. The selected supplier must state which of those two the drawing is. Calling both by one product name hides the crane and the permit.
How a buyer can check a claim: send the design basis, ask which code combination was used, ask for the weld procedure number, and ask which element the fire minute refers to. A blank design-basis checklist can be reviewed with a qualified professional selected for the project. That review should check units and blank cells. It does not reproduce a full finite-element run and it does not replace the engineer of record. Test data for a sandwich panel, when offered, should name the standard, the specimen build-up and the laboratory. A core brochure without those three items is not treated as a result.